Energy Audits

  • Our Energy Audit is a step-by-step process that identifies energy inefficiencies in your home, offering cost-effective solutions to boost comfort, health, and efficiency. It includes a detailed inspection, a report with recommendations, and an optional work estimate.

  • Our Energy Audits can help lower bills, improve comfort, boost efficiency while enhancing air quality and can reduce your carbon footprint. It saves money and also increases your home's value.

    • Physical Inspections: Identify maintenance and structural issues.

    • Blower Door Tests: Detect air leaks and improve energy efficiency.

    • Infrared Imaging: Pinpoint insulation gaps and air leakage.

    • Duct Pressure Testing: Measure and reduce air loss in ductwork.

    • Moisture & Humidity Testing: Address water damage, mold risks, and comfort levels.

    • Carbon Monoxide & Gas Leak Testing: Ensure your home’s air is safe and hazard-free

See How It’s Done!

Energy Check team performing an energy audit on a house, assessing HVAC systems, insulation, and energy efficiency to identify cost-saving improvements

Schedule an Energy Audit Today
Visual timeline of an Energy Check project, outlining key steps from assessment to completion. See the full process for improving home energy efficiency

Code Inspections

Are you an individual or contractor working with a new-build project? We can help!

Blower Door Tests Performed

+600

Duct Blast Tests Performed

+550

Blower door set up in a door frame to assess air leakage in a home, helping identify energy efficiency issues and areas for improvement

Blower Door Testing

Under the 2021 Virginia Residential Building Code, blower door testing is required for all new residential construction. Code stipulates that the building unit shall have an air leakage rate not exceeding 5 air changes per hour at a pressure of 50 Pa. We offer comprehensive testing with same-day reports to help keep your project timeline moving in the right direction.

Duct blast test set up on a fresh air return vent to assess airflow and air leakage, ensuring proper ventilation and energy efficiency in the home

Duct Leakage Testing

Under the 2021 Virginia Residential Building Code, duct leakage testing is required for all new residential construction. Code stipulates that the total leakage of the ducts shall be less than or equal to 4.0 cubic feet per minute per 100 square feet of conditioned floor area. We offer both post-construction and rough-in Duct blast testing.

We provide certified blower door testing for building contractors in Southwest Virginia, covering the Town of Blacksburg, Town of Christiansburg, City of Radford, Montgomery County, Giles County, Franklin County, Botetourt County, and Floyd County. After testing, we will prepare a report with the results and email it to the relevant county officials on the same day. Contact us for pricing information.

2021 ICC Virginia Residential Code

Additional Services